The main thermo power station in the area has been damaged.
该地区那座主要的热电厂已被损毁。
A computer auto - control system about heating is developed in this paper.
本文研制了热电厂采暖供热计算机自动控制系统.
Shashi Thermal Power Plant Unit No.9 declared officially retired.
沙市热电厂9号机组宣告正式退役.
K KW Thermal Power Unit , Luoyang Thermal Power Plant.
392004洛阳热电厂30万千瓦火电机组.
Several TSMS are operating under high pressure and temperature fossilplant over 500 MW.
一些TSMS是在热电厂高于500MW高压及高温条件下使用的.
China's electricity regulators never authorized the $ 362 million coal - burning plant.
中国电力监管部门从未批准这个投资 3.62亿 美元的热电厂.
Longfeng Plant is medium temperature and medium pressure fuel plant which built in 1960's. "
龙凤热电厂是六十年代建立起来的中温中压燃油热电厂.
The automatic control of boiler's drum level and steam temperature is realized by applying FIX software.
介绍应用FIX软件实现热电厂锅炉的温度、水位自动控制.
They were replaced with hotheat generated by a cleaner - burning coal - fired power plant located outside the city.
这些锅炉被一家位于这座城市郊外的更为洁净的热电厂驱动的水暖系统所取代.
The phenomena of condenser vacuum slowly running down occurred many times in Yinchuan Congeneration Power Plant.
介绍了银川热电厂二期工程投运一年以后,多次出现凝汽器真空缓慢下降的现象.
There were two problems that flue gases entrained water and flue dust concentration exceeded discharge standard.
某热电厂尾部烟气的湿法除尘装置存在严重的烟气带水和烟尘排放浓度超标问题.
Applications of high voltage inverter in the power plant boiler supply is explained.
阐述了高压变频器在热电厂锅炉给水中的应用.
Thermo - electric plant can reduce consumption of coal instead of present heating boiler of seat . 2.
热电厂建设可取替县城现有的采暖锅炉,减少燃煤,有效地节约能源.
What produce coal to furnish heat and power plant of this city.
所产煤炭供给该州的热电厂.
Shashi Plant Unit No.9, after shutting down, will help reduce the level of overall energy consumption.
沙市热电厂9号机组关停后, 将有利于降低公司整体能耗水平.